Thursday, June 25, 2009

Pictures before Renovation

Renovation-to-do list

Quotation can send to my yahoo email, username is silaz777 ending with @yahoo.com.sg
_______________

Hack away both toilets wall tiles
Hack away common toilet floor tiles (KIV)
Hack away MBR toilet floor tiles (KIV)
Hack away / Overlay kitchen floor tiles
Hack away kitchen wall tiles (half height)(KIV)
Remove rubbish & old furniture (KIV)

Supply & install kitchen wall tiles half/full height(KIV)
Plastering of kitchen wall (KIV)
Scrapping of common toilet ceiling due to ugly drips from upstairs
Supply & install 2 toilets wall tiles
Supply & install common toilet floor tiles c/w anti-slippery abilities (KIV)
Supply(KIV) & install MBR toilet floor tiles c/w anti-slippery abilities (KIV)
Supply & install kitchen floor tiles c/w anti-slippery abilities
Supply & install living room floor tiles
Supply & install floor tiles at the entrance of the main door (KIV)

Supply & install bi-fold door at the master bedroom toilet (KIV)
Supply & install bi-fold door at the common toilet (KIV)
Supply & install 2 set of lighting point & mirror for 2 toilets
Install 1 set of WC for MBR toilet (KIV 2nd Set for common toilet)
Install 2 set of water basins
Supply & install stainless steel water pipe for cold water for the whole unit

Supply & install 6-9ft wardrobe at master bedroom area (KIV)
Supply & install lighting point at both side of master bedroom area
Supply & install lighting point at bedroom 2
Supply & install 2 sets of door frame at 2 bedrooms
Supply & install bi-fold door at the store-room (KIV)
Supply & install false ceiling(KIV) & lighting point at the living room area
Supply & install xx(number to be confirmed) set of lighting at the living room area
Supply & install 15ft(length to be confirmed) bottom kitchen cabinet, hiding rubbish chute
Supply & install 5 ft(length to be confirmed) solid surface kitchen table for the kitchen cabinet
Supply & construct 2inch base c/w tiles for kitchen cabinet & fridge, KIV for washing machine
Supply & install stainless steel rubbish chute bin
Painting for whole unit with Nippon 3 in 1 paint (KIV)
Supply & install new main door
Supply & install new main gate (KIV)
Supply & install power point switch for whole unit
Supply & install 1 sliding door dividing kitchen area and living room area (KIV)
Supply & install new set of windows for whole unit (KIV)
Supply & install new set of window grille for whole unit (KIV)
Supply & Install 2 set of nacro windows at 2 toilets (KIV)
Rewiring whole unit (KIV)

Floor Plans